OMK Tube

  • SPECS
  • HISTORY

OMK Tube
Houston, Texas

Owner
OMK Industries

Architect
Jim Hervey Morris Architecture & Design

Completion Date
December 2012

Gross Square Footage
200,000 Square Feet

Project Specs
Building Area 200,000 SF
9,000+ Construction Manhours
30,201 Cubic Yards of Concrete
2.8 mil Tons of Reinforcing Steel
92,000 Cubic Yards of Imported Fill
3 mil Pounds of Erected Steel
5,000 Tons of Cement Stabilized Sand
310 Miles of Electrical Wire
250,000 LF on Conduit
5 Overhead Cranes
1,200LF of Elevated Walkways
30 Acres of 14” Concrete Paving for Pipe Storage

Mission served as the general contractor for the USA-Houston based operations for OMK Industries, a subsidiary of a Russian based conglomerate. From the beginning, this project was an immediate fast-track schedule.  Design for this project was started only 1-1/2 months before Mission mobilized the site and started the site excavation on the 80+ acre site in April 2012. Project completion was established as December 1, 2012 with NO time for extensions for weather delays.

In order to meet the deadline, Mission led the design criteria by placing the foundation footings, auger piles and erecting the steel frame prior to installing the building foundation, slab, 2 miles of railcar tracks and slitter pits. The multiple slitter pits throughout the building reached 45’ in depth below grade. During the erection of the steel frame, the building was designed and literally built in sections as the final drawings were issued. Precise scheduling required countless man-hours of project coordination meetings between the client, architect, engineers, subcontractors and the Mission team to construct the building into a complete and enclosed structure.

The last of the facility design was completed only (3) months prior to our December deadline. Construction was completed in eight (8) months as required. Mission will be starting Phase II in 2014.

 

 

 

 

photo gallery

PROJECT CATEGORIES

Office Buildings
Campinille time warner admin Imagenet Risk Control Services EB Cape
Liturgical Facilities
Beth Chinese Baptist Buddist Shree
Healthcare Facilities
westgreen Katy Phase 1 Katy Phase 2 Katy Phase 2
Educational Facilities
Emery emery expansion Monarch SchoolHBU College UH Robertson Stadium
Institutional Facilities
Airport Childrens Assesment Centerseven acres Freedom Lasik
Industrial Facilities
Airport Airport Airport Airport Airport tyco
Financial Facilities
SNB East Lawn Concord Bank SNB Moticello Independence Bank SNB PostOak
Broadcasting Facilities
Channel 13 Time Warner Keith Harrow Time Warner Call Center lieberman channel 8
Retail / Entertainment
BassettFun Tiki Rose Seafood
Resturants
Fisher Houses - USA
Fisher House Houston Fisher House San Antonio Fisher House Tampa Bay Fisher House Dallas
Custom Residential

frank